Meter assurance

Meter reset review

Resolve genuine device resets without editing source readings. Unconfirmed rollbacks continue to block invoice generation.

Only acknowledge a confirmed physical reset or meter replacement.ParkPower preserves both readings and stores your name, reason and timestamp. Ordinary data errors should be investigated, not acknowledged.
Blocking rollbacks
Confirmed resets
Controlled device action

Reset meter for tenant handover

This is never triggered by an assignment change. ParkPower captures an immutable final reading, presses only the mapped same-device reset button, verifies near-zero, then records the segmented billing boundary.

Action required

Unresolved rollbacks

No unresolved meter rollbacks.
Permanent audit trail

Acknowledged resets

No meter resets acknowledged yet.