Meter assurance
Meter reset review
Resolve genuine device resets without editing source readings. Unconfirmed rollbacks continue to block invoice generation.
Blocking rollbacks—
Confirmed resets—
Controlled device action
Reset meter for tenant handover
This is never triggered by an assignment change. ParkPower captures an immutable final reading, presses only the mapped same-device reset button, verifies near-zero, then records the segmented billing boundary.
Action required
Unresolved rollbacks
No unresolved meter rollbacks.
Permanent audit trail
Acknowledged resets
No meter resets acknowledged yet.